First job is to get the interior stripped out, biggest part of the job was to get the LPG tank disconnected and out of the rear load area.
with the tank out, tailgate down and the rear seats folded forward, theres a full 7' of bed. Long enough for 2 bikes. Rear seats will get pulled out next then I can work out where to cut the roof.
No comments:
Post a Comment